Determine if continuous headers are toe nailed to studs with 4 8d nails.
Roof framing checklist.
Toe nail rim board to sill plate at 6 on center.
Add studs under all double girder truss double joist.
Roof sheathing is nailed every 6 in.
Depending on how wide the home is you can divide the total length in feet by two to determine how many trusses will be needed.
Roof must be complete before framing inspection.
In high wind areas sheathing along the eaves rakes and ridges is nailed every 6 in.
Wall framing inspection checklist continued m.
Truss roof framing as per design.
Approved documents which show.
Building is safe and accessible.
Determine how many rafters you ll need for the roof.
For all new construction.
For most load bearing requirements a roof truss will need to be placed every two feet along the walls.
Inspect rafter materials and allowable spans r 802 1 r 802 5 tables r 802 5 1 1 r 802 5 1 8 a.
The american plywood association says there s no reduction in strength for nails overdriven by 1 16in.
Layout plans truss members connection schedule permanent bracing details dormers roof structures on manufacturer s drawings equipment appliances on man ufacturer s drawings location as per layout alignment bearing spacing connections to bearing points.
Permit residential framing checklist approved city stamped plans roof specifications and engineered floor system information is on site and accessible to inspector.
Get fix for any cut damaged joist or truss from joist or truss company.
Determine if double studs are face nailed with 10d nails at 24 in.
Roof framing inspection checklist 1.
Along the edges and every 12 in.
Locate the grade mark on the rafter to determine species and grade.
2 bracing section 8 3 coupled roof connections ceiling joists to rafters collar ties to rafters 7 1 2 2 4 tie downs section 9 5 transfer of wall frame bracing 8 3 6 9 6 point loads including beams struts are adequately supported.
R802 3 the rafters are framed opposite each other at the ridges.
Daily safety inspection report sample is an audit report which is obviously crucial for any company to track the health and well being of the employees.
Determine if studs are toe nailed to sole plates with at least 3 8d or 2 16d nails.
Job address is posted in a visible location per irc section r319 1.
The fields in the template include equipment standards of workers.