Take care the first piece is aligned precisely perpendicular square to the edge.
Roof sheet installation.
Make absolutely sure the first sheet laid is properly positioned.
Roofing installation guide orient sheets before lifting.
Keep these tips in mind when roofing in hurricane areas.
Prime the face on the roof and allow to dry before installing cap sheet.
Learn about the liberty sbs self adhering base ply sheet.
The connection between the roof sheathing and the structure is a vulnerable point that is known to fail during a hurricane.
Step 3 installing liberty self adhered cap sheet.
How to install roof sheathing 1.
Measure the roof area.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Liberty sbs self adhering roofing system will provide long lasting protection for the low slope areas of your property without the danger or hassles associated with the installation of other conventional roofing products.
Ventilate the roof according to current building codes step 3.
For best weatherproofing begin installing your sheeting on the side opposite the.
Position your next sheets.
Install edge flashing over the base sheet in a 1 8 bed of cement and stagger nail with two rows of roofing nails 3 o c.
Cover sheathing with.
Allow for a minimum of 18.
If yours do not then you will need to drill holes.
Install the roofing screws vertically along each rib in the panel.
Pre drill holes on the ridges.
Some panels have pre drilled holes.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Place the first screw.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
And scroll down to see more details on each with installation hints and tips below.
Position the first piece of plywood.
Space the screws about 12 in 30 cm apart down the entire piece of metal.
Properly fasten panels including fastening and spacing hints step 4.
Measure from the peak of the roof along each rafter on one side of the roof to determine the exact length of each.
Use your neoprene washer head screws to secure the metal to the sheathing.
Cut each rafter tail on the chalk line with a circular saw to ensure that every rafter is the same length.
Most panels come up to 32 feet 9 8 m in length.
Laying the first sheet of roofing.
Where do i begin.
Installing corrugated roofing 1.
You will need to order enough metal material to cover the entire roof and this process.
Remove the old roof.
During a hurricane the strength of the sheathing on the roof can greatly impact the homes ability to weather the storm.
Align cap sheet 1 4 from the edge at the lowest point of the roof.
Check the nailing surface is level step 2.